Laserfiche WebLink
C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all that app/t): IR Sy ( Alarm history report <br />Technician Name (print): =40NUe r',Zmo Signature: <br />Certification No.: 893 License. No.: 6 U W B24 33 .7 ~ U 7- <br />Testing Company Name: - �4m _ Es r Phone No.:� � �%'Si</ - 0&.z <br />Site Address: _ +7-" rj. 4 UA,, - Date of Testing/Servicing: / S 16 <br />Page 1 of 3 <br />Monitoring System Certification <br />D. Results of Testing/Servicing <br />03101 <br />MON*RING SYSTEM CERTI 'I 'TI <br />For Use By AII,Inr•rsdiclions 1171hin the Slave of C'crlifbrnio <br />Arvhorih� Cited: Chapter 6. 7, Fleallh and Sc?P/v Code,- C'halver 16, DiFisiorr 3, Tile 23, Cal forma Code of Regyida/ions <br />This form must be used to document testing and servicing of <br />monitoring equipment. A separate certification or report must be <br />prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br />the tank system owner/operator. The owner/operator must submit a cop this form to the local agency regulating UST systems <br />within 30 days of test date. <br />A. General Informat'on ,, ll <br />Facility Name: f W <br />/moi % Bldg. No.: <br />Site Address: 6'17 A) d 44e/ <br />City: 5 A.V t �n Zip: lrZZ) 2 - <br />Facility Contact Person: -PAS i d <br />Contact Phone No.: {��) !l� / 15,71 <br />Make/Model of Monitoring System: yp_ TQI ? 5-L <br />Date of Testing/Servicing: / S—/ 7 <br />B. Inventory of Equipment Tested/Certified <br />Check the approeriate boxes to indicatespecific equipment ins ected/serviced: <br />Tank ID: <br />Tank ID: <br />In -Tank Gauging Probe. Model: /ILv" i <br />�siln-Tank Gauging Probe. Model: / <br />Annular Space or Vault Sensor. Model: t/ ? <br />It Annular Space or Vault Sensor. Model: Y7 O <br />Piping Sump / Trench Sensor(s). Model: 2y,F <br />U( Piping Sump / Trench Sensor(s). Model: Zd� <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. Model: <br />Electronic Line Leak Detector. Model: C c o <br />kElectronic Line Leak Detector. Model: ftt <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Tank Overfill / High -Level Sensor. Model: <br />❑ Other (s ecif equipment type and model in Section E on Pa e 2). <br />EIOther (specify equipment t e and model in Section E on Pa a 2). <br />Tank ID: b 1 ,�_ <br />Tank ID:�) Z <br />In -Tank Gauging Probe. Model: i <br />In -Tank Gauging Probe. Model: �,,er G <br />Annular Space or Vault Sensor. Model: V20 <br />Annular Space or Vault Sensor. Model: � ZD <br />gL Piping Sump / Trench Sensor(s). Model: <br />& Piping Sump / Trench Sensor(s). Model: ' <br />❑ Fill Sump Sensor(s). Model: <br />❑ Fill Sump Sensor(s). Model: <br />❑ Mechanical Line Leak Detector. Model: <br />❑ Mechanical Line Leak Detector. Model: <br />''Electronic Line Leak Detector. Model: (I'[[ 14lectronic <br />Line Leak Detector. Model: P&I09� <br />❑ Tank Overfill / High -Level Sensor. Model: <br />Tank Overfill / High -Level Sensor. Model: <br />❑ Other (specia a ui ment ty a and model in Section E on Pa a 2). <br />❑ Other (s eci a ui ment tXee and model in Section E on Pae 2). <br />Dispenser ID: --7 <br />Dispenser ID; z -� <br />Dispenser Containment Sensor(s). Mode(: FI/7fe t10 • 00 1 <br />PrDispenser Containment Sensor(s). Mode(: n J <br />Shear Valve(s). <br />Rf Shear Valve(s). <br />❑ Dispenser Containment Float(s) and Chain(s). <br />❑ Dis enser Containment Float(s) and Chain(s). <br />erID: - 7 <br />Dispenser ID: -� <br />fpe <br />Dispenser Containment Sensor(s). Model ®D <br />t <br />Dispenser Containment Sensor(s). Model: py I <br />Shear Valve0. <br />/Zl Shear Valve(s). <br />Dis enser Containment Float(s) and Chain(s). <br />LJDispenser Containment Float(s) and Chain(s). <br />Dispenser ID: // <br />gDispenser Containment Sensor(s). Model: bo 1 <br />Dispenser ID: / 0 ' 'L <br />A Dispenser Containment Sensor(s). Mode(: ) <br />Rf Shear Valve(s). <br />�, <br />,el Shear Valve(s). <br />IN ❑Dis enser Containment Float(s) and Chain(s). <br />❑Dis enser Containment Float(s) and Chain(s). <br />*If the facility contains more tanks or dispensers, copy this form. Include information for every tank and dispenser at the facility. <br />C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br />manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br />information is correct and a Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br />reports, I have also attached a copy of the report; (check all that app/t): IR Sy ( Alarm history report <br />Technician Name (print): =40NUe r',Zmo Signature: <br />Certification No.: 893 License. No.: 6 U W B24 33 .7 ~ U 7- <br />Testing Company Name: - �4m _ Es r Phone No.:� � �%'Si</ - 0&.z <br />Site Address: _ +7-" rj. 4 UA,, - Date of Testing/Servicing: / S 16 <br />Page 1 of 3 <br />Monitoring System Certification <br />D. Results of Testing/Servicing <br />03101 <br />