My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2004-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 2:12:29 PM
Creation date
6/23/2020 6:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2008
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_2004-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 7. ER-DISPENSER CONT NT MCI TERING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure . ❑Vacuum ydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:� w e v,, , 1 CIA t Equipment Resolution: 2, <br /> UDC# 9/ UDC# 101/Z— UDC# C# <br /> UDC Manufacturer: O'PC,) p P uJ <br /> UDC Material: r;b4•✓ P t.de- <br /> UDC Depth: J3 3' Z,l 3 ff 2„ <br /> Height from UDC Bottom to Tops I I Z( 11 , <br /> of Hi est Pi in Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: l <br /> Condition of UDC prior to 5 VA q t l a MOWA4. <br /> testing: bi`(% L� f i <br /> Portion of UDC Tested W-t4-,-r L, v k2 OV' <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes �lo ❑NA ❑Yes 'RNo ❑NA ❑Yes o ❑NA ❑ ❑No ❑NA <br /> roduct and water)?' <br /> Turbine shutdown response time t3 <br /> Is system programmed for fail- ❑Yes, ❑No A ❑Yes ❑No A ❑Yes o ❑NA ❑Y ❑N ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑Yes ❑No 54A ❑Yes ❑No A ❑Yes 10A ❑NA ❑Yes ❑ o ❑NA <br /> operational?* 4 <br /> Wait time between ing <br /> pressure/vacuum/ ater d <br /> starting test 16 t A_ S <br /> Test Start Time: (2,'35 2 v <br /> Initial Reading a,): <br /> Test End Time: l.' O S'� 490 <br /> Final Reading(RF): --ct,-e-,ke <br /> Test Duration: 30 r 30 Y <br /> Change in Reading(RF-R): u C.R,c W D <br /> Pass/Fail Threshold or Criteria: o 0 LUO i�— P" <br /> Test Result Pass ❑Fail Pass ❑Fail Ef Pass Q FailPass D Aail <br /> Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA ❑ es ❑No DNA ❑ es ❑No A <br /> Was sensor properly replaced and <br /> verified functional after testing? ^s ❑No ❑NA .N..Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑ <br /> 1z <br /> Comments (include.in ormation on repairs mad®e�Lr�iyo/r to testing, and recommended ollow-u or�1 ailed tests)/ <br /> S'IM dt E i Ct m�c.0 w+� � �t 'e L ewt 14(®6! 0 � �E�� �i�" gF f/D�`I d <br /> Di <br /> Q�ed jfese &VA et clG d -re& (e, <br /> I If the entire depth of the UDC is not tested,specify how much was tested If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.