Laserfiche WebLink
SWRCB,January 2002 0 Page I of <br /> 9. SPHUOVERFILL CONT NT BOXES <br /> Facjk is Not E ui d With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> st Method Developed By: ❑Spill Bucket Manufactures ❑Industry Standard 0 Professional Engineer <br /> 0 Other(Spec) <br /> Test Method 'sedx ❑Pressure ❑Vacuum 0 Hydrostati,q,,-,"� <br /> "�.. D Other(Spec) <br /> Test Equipment Used: Equipment Resolfifion: <br /> Spill Boz t# Spill Box# �f,,-'' Spill Box# Spill Boz# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Time: '"� <br /> Final Reading.(RF): <br /> 4 <br /> Test Duration: <br /> Change in R, g(RF-": <br /> Pass/F shold or <br /> Crit a: <br /> Test es t: ❑ Pass 11 Fail . 0 Pass b, [I Pass O Fah D Pass q Fail <br /> Com ents—Cinclude Information on re airs made rfor to testing, and recommended ollow-u or ailed tests) <br />