My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HUNTER
>
642
>
2300 - Underground Storage Tank Program
>
PR0231148
>
COMPLIANCE INFO_2004-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 2:12:29 PM
Creation date
6/23/2020 6:44:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2008
RECORD_ID
PR0231148
PE
2361
FACILITY_ID
FA0000799
FACILITY_NAME
STOCKTON MOBIL #1
STREET_NUMBER
642
Direction
N
STREET_NAME
HUNTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906035
CURRENT_STATUS
01
SITE_LOCATION
642 N HUNTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231148_642 N HUNTER_2004-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Rosuhs, of Testiag/ServicARAP <br /> Software Version Installed: <br /> Complete the following checklist: <br /> U2 Yes U No* Is the audible alarm operational? <br /> El Yes L3 No* Is the visual alarm operational? <br /> U Yes L3 No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> M Yes Q No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> LJ Yes LJ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> M N/A operational? <br /> M Yes U No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> El N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) a Sump/Trench Sensors; W Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? LKYes; U No. <br /> KI Yes L3 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device_(�Leno <br /> Ll N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> FLS,e 60 1_�_tt fill point(s)and o2erating properly? If so,at what percent of tank ca acity does the alarm triaer? ,—, % <br /> U Yes* ES No Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> U Yes* 61 No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) U <br /> I Product; U Water. If yes,describe causes in Section E,below. <br /> Yes U No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes U No* Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.