My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
2300 - Underground Storage Tank Program
>
PR0231216
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 4:22:00 PM
Creation date
6/23/2020 6:45:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231216
PE
2361
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
01
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231216_4511 PACIFIC_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1H <br />IN! <br />,.. .... ,., <br />DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) TECHNICIAN: DAVE WINKLER <br />Site: SHOP N GO cert # 0082 Exp. 2018 <br />Date: 5-8-17 Time:2 <br />Nozz /Fuel 20 CFH 60 CFH 100 C <br />FH PASS/FAIL Nozz /Fuel <br />20 CFH 60 CFH 100 CFH <br />PASS/FAIL <br />Grade <br />(.15" Water) (.45" Water) <br />(95" Water) <br />Grade(.15" <br />Water) (A5" Water) (.95" Water) <br />60CFH <br />80CFH- <br />1 ALL <br />.21 <br />.44 <br />PASS <br />--- <br />2 ALL <br />.22 <br />.40 <br />PASS <br />3 ALL <br />.25 <br />.39 <br />PASS <br />_ <br />4 ALL <br />.22 <br />.38 <br />PASS <br />5 ALL <br />.20 <br />.44 <br />PASS <br />_ <br />6 ALL <br />.20 <br />.38 <br />PASS <br />LIQUID REMOVAL CHECK **See Long Form Test Report for Wet FailureTesting <br />B Y <br />1=D ry <br />Blockage Tester Integrity: <br />❑DRY <br />DRY ❑DRY <br />❑DRY <br />[]DRY <br />w.c. 5 minutes PASS <br />ml <br />ml mt <br />mt <br />mt <br />❑DRY <br />❑DRY []DRY <br />❑DRY <br />❑DRmI <br />-1 <br />❑DRY <br />❑DRmI � <br />❑DRYI <br />DRY <br />ml <br />❑DRY <br />❑DRYI ❑DRYI <br />QDR� <br />—OD <br />ml <br />—O—DRY ❑DRY <br />❑DRY <br />❑DRY MI <br />ml <br />❑DRY <br />ml <br />❑DRY <br />ml <br />❑DRm! <br />FBI <br />—O—DRY ❑DRmI <br />—O—DRY <br />DRY <br />DRY <br />DRY <br />rw <br />❑DRYI <br />❑DRVI ❑DRYI <br />❑DRYI <br />Job Complete <br />Repairs Done to Pass Test: <br />nd <br />mI ml <br />MI <br />❑ Not Complete <br />Repits Still Needed: <br />Parts: None <br />Drop Tube rings <br />Fill Adaptor Gaskets <br />Hoses <br />Nozzles <br />Breakawa s <br />PV ValvesI <br />Whip Hose <br />Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.