Laserfiche WebLink
D. Results of Testing/Servicing <br />Software version installed: 334.00 <br />0 Yes <br />❑ No* <br />Is the audible alarm operational? <br />® Yes <br />❑ <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />❑ No* <br />No <br />Is the visual alarm operational? <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />® Yes <br />❑ No* <br />® Yes <br />❑ No* <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />operation? <br />If alarms are relayed to a remote monitoring station, is all communications equipment e. modem o <br />g., ) operational? <br />❑ Yes <br />❑ No* <br />® N/A( <br />® Yes <br />❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />❑ N/A fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />positive shut -down? (Check at/ that apply) ® <br />Sensors; ® Dispenser Containment Sensors. Sump/Trench <br />❑ Yes <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />® N/A installed), is the overfill warning alarm visible and <br />audible at the tank fill point(s) and operating properly? If so, at what percent of tank capacity <br />does the alarm trigger? /o <br />® No Was any monitoring equipment replaced? If yes, identify specific sensors,robes, or other <br />and model for all replacement parts in Section E, below. p equipment replaced and list the manufacturer name <br />® No Was liquid found inside any secondary containment systems designed as d systems? Check a// that apply) <br />❑Product; y dry ( PPY) <br />❑ Water. If es, describe causes in Section E, below. <br />❑ No* Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />❑ No* <br />❑ Yes <br />❑Yes* <br />® Yes <br />® Yes <br />is all monitoring equipment operational per manufacturer's specifications? <br />* In Section <br />E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />