My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1985-1995 DOUBLE CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_1985-1995 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:36:52 PM
Creation date
6/23/2020 6:45:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-1995 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_1985-1995 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />WRITTEN MONITORING PROCEDURES <br />Underground Storage Tank Monitoring Program <br />FACILITY NAME: �,1 w i� S, Ii Ma,e%a.i =tf7 <br />FACILITY ADDRESS: 13z / Al,,. ! 4 C r 4 4 n1 )264d,Ac )c 4 d Of 7,'U7 <br />A. Describe the frequency of performing the monitoring: <br />Tank Data recorded daily, analyzed monthly by Statistical Inventory Reconciliation <br />(SIR), precision tested biannually. <br />Piping Monitored hourly (continuously) by mechanical leak detectors precision tested <br />annually, SIR analysis performed monthly. <br />B. What methods and equipment will be used for performing the monitoring: <br />Tank SIR analysis performed monthly by USTMAN Industries tank precision testing_ <br />by various State certified tank testing vendors. <br />PipingRed Jacket Model XLD or PLD Mechanical Leak Detectors SIR and line testing <br />as above. <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan must <br />be attached): Data collected at tanks, recorded and kept at checkout counter, analyzed <br />offsite: Mechanical leak detectors are located in turbine sump. <br />D. List the names and titles of the people responsible for performing the monitoring and/or <br />maintaining the equipment: A14cAA44,e S,�IA" 4 P,,..re-lV,?,AJe•t Franchisee, <br />responsible for monitoring; John Willow, Director of Gasoline, and Mike Karvelot <br />Director of Environmental Affairs, responsible for maintaining the equipment. <br />E. Reporting format for monitoring: <br />Tank Monthly Fuel Reports and Monthly SIR Results. <br />Piping Monthly SIR Results. <br />F. Describe the preventive maintenance schedule for the monitoring equipment: <br />Maintenance not required. Mechanical leak detectors tested annually and replaced upon <br />failure. <br />G. Describe the training necessary for UST operation, including the monitoring equipment: <br />Franchisee is trained to operate the complete UST system y Quik Stop personnel at the <br />time the system is installed Franchisee thereafter, is responsible for training, his or her <br />store employees on the system operation. <br />DATE /Q/6 .5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.