Laserfiche WebLink
UST SYSTEM DR INFORMATION <br />1. <br /># <br />l 24 <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />v <br />Plans drawn to scale in non -erasable print. <br />MANUFACTURER <br />jX%bLy-we <br />COMPOSITION <br />3. <br />V <br />Plot plan to show location of tanks and alt associated piping. <br />L, - Wk -6L <br />4. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />CORROSION PROTECTION <br />U.L. LISTED <br />5. <br />V/ <br />Tank cross-sectional diagram. <br />6. <br />-,/— <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />V1 <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 2635] <br />verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />J <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. <br />7- <br />At the installation site, prior to installation, a tightness test shall be performed on both primary <br />(10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. <br />Tank integrity test required upon completion of installation with tank in operating condition. Test <br />results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />17 <br />TAMV r1V&PMTTTrAJ <br />TANK # <br /># <br />l 24 <br /># # # <br />-ZZ ® '2— <br />CAPACITY <br />Qgo <br />k1l. 00 0 <br />MANUFACTURER <br />jX%bLy-we <br />COMPOSITION <br />e <br />MODEL <br />L,.j <br />L, - Wk -6L <br />PRODUCT <br />0 <br />U CA <br />CORROSION PROTECTION <br />U.L. LISTED <br />COMPATIBILITY WITH 100% <br />METHANOL <br />13. TANK(8) TO BE INSTALLED <br />A. Steel -clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested at the installation site using an electric resistance holiday detector. <br />(2) Vacuum applied to interstitial space. <br />jZ B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial. space. <br />(3) Hydrostatic annular (primary tank pressure test). <br />C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no Less than every 60 days, <br />k, <br />