My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9321
>
2300 - Underground Storage Tank Program
>
PR0231261
>
COMPLIANCE INFO_2009-2012 DOUBLE CHECK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:56:44 PM
Creation date
6/23/2020 6:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012 DOUBLE CHECK
RECORD_ID
PR0231261
PE
2361
FACILITY_ID
FA0002890
FACILITY_NAME
QUIK STOP MARKET #2120*
STREET_NUMBER
9321
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
080-180-05
CURRENT_STATUS
01
SITE_LOCATION
9321 N THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231261_9321 N THORNTON_2009-2012 DOUBLE CHECK.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPLIASER CONTAINMENT ru DC TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: O Pressure o vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#1/2 131s #3/4 <br /> UDC manufacturer Bravo Bravo <br /> UDC material Steel Steel <br /> UDC depth (inches) 9 9 <br /> Height from UDC bottom to highest <br /> piping penetration Bottom Bottom <br /> Height from UDC bottom to lowest <br /> electrical penetration Bottom Bottom <br /> Condition of UDC prior to testing Dry Dry <br /> Portion of UDC tested Entire Entire <br /> Type of shut-down present Float Float <br /> Was sensor removed for testing? N/A N/A <br /> Was sensor properly replaced after testing? N/A N/A <br /> Depth of water level from UDC bottom (in.) 6 6 <br /> Wait time for water level to stabilize (hr:min) 0:03 0:03 <br /> Test start time 10:13 AM 10:13 AM <br /> Initial Probe Reading 7.4814 5.4051 <br /> Test end time 10:28 AM 10:28 AM <br /> Final Probe Reading 7.4812 5.4044 <br /> Test duration (hr:min) 0:15 0:15 <br /> Change in water level (±0.0000 inches) -0.0002 -0.0007 <br /> Pass/Fail threshold (±0.0020 inches/;Hr.) 0.0020 0.0020 <br /> TEST RESULT PASS PASS <br /> Comments: <br /> 0 2012 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.