My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2002-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 3:24:31 PM
Creation date
6/23/2020 6:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2012
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2002-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />11 <br />Page 3 of —2 <br />i est metnoa Uevetoped By: ),Q Piping Manufacturer ❑ Industry Standard 0 Professional Engineer <br />f 13"Other (Snecifv) <br />Test Method Used: Pressure G Vacuum ❑ Hydrostatic <br />O Other (Spec) <br />Test Equipment Used: fe55uv 2 u t ' Vi S fi N 1 vv t'vt <br />Equipment Resolution: <br />Piping Run # j_ <br />Piping Run # 2 <br />Wing Run # <br />iping Run # <br />Piping Material: <br />�"e- C ee St <br />.9 v 4 SS <br />Piping Manufacturer: <br />ej t `4-tA <br />Piping Diameter: <br />if <br />3 <br />' <br />Length of Piping Run: <br />p v D I <br />r <br />Product Stored: <br />Method and location of <br />i in -run isolation: <br />e between applying <br />—pressure/,Vacuum/water and <br />startin test: <br />; r- et <br />T -c-54. 6 ,,04 Q A- <br />,Q 04. <br />a-1 <br />C low stet 1 ,s 4- <br />36 <br />� <br />Test Start Time: <br />q; u () I <br />'i ; U d <br />F' <br />Initial Reading (Rt): <br />J P 5:;x <br />r <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />j/.v u"1/ <br />ku tom" ✓ <br />`� <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or <br />Criteria: <br />N d 1, os S Tv\ S <br />U L <br />Test Result: <br />Fail <br />rPass ❑ Fail <br />❑Pass ❑ F4 IJ <br />❑Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.