Laserfiche WebLink
P, -q <br />WKWIFIED PROGRAM CONSOLIDATED FORM Wr <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VI. UNDER DISPENSER CONT NT (UDC) MONITORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD <br />490-54 <br />ab <br />490-54bb <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING �t 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />❑ 4. NO DISPENSERS ❑ 99.OTHER (Specify): <br />PANEL MANUFACTURER: O a9ass <br />MODEL #: <br />49D-56. <br />LEAK SENSOR MANUFACTURER 490.57 <br />1 MODEL #(S): <br />490.59 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES 0 b. NO <br />490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a. YES 10 b. NO <br />490.60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES b. NO <br />490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a. YES ❑ b. NO <br />490-62 <br />W. .. <br />2. UDC CONSTRUCTION IS SINGLE -WALLED ❑ 2. DOUBLE -WALLED <br />490-63 <br />IF DOUBLE WALLED: <br />490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1. LIQUID 2. PRESSURE 13 3. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑ b. NO <br />490,646 <br />VII. PERIODIC SYSTEM TESTING <br />1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />62. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490.66 <br />04 SPILL BUCKETS ARE TESTED ANNUALLY. <br />490.67 <br />VIII. RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />93 -Alarm logs 490.68a ❑ Visual Inspection Records 490-686 Tank integrity testing results 49"& <br />SIR testing results (and supporting documentation records). 490-M U Tank gauging results (and supporting documentation records). 49"m <br />ATG Testing results (and supporting documentation records). 490-6&f Corrosion Protection 60 -day logs 4go-as <br />(B -Equipment maintenance and calibration records. 490-68h <br />IX. TRAINING <br />ersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.6% <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 49o -69b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 4go-69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49o -69d <br />CALIFORNIA UNDERGROUND STORAGE TANK LAW 4 <br />STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 49o.69s <br />❑ OTHER (Specify): M69k m69i <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />(ICC). <br />'Me—Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />A Operation of the UST systems in a manner consistent with the facility's best management practices <br />• The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />A The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />• Names of contact person(s) for emergencies and monitoring alarms. 4go-7o <br />X. CONMENTWADDITIONAL INFO TION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490.71 <br />M. PERSONNEI, RESPONSIBIIJMS <br />The UST Owner/Operator is responsible for ensuring that: 1) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The followi on(s) are responsible for performing the monitoring and equipment maintenance: <br />NAME C l 4go-72 TITLE <br />4W73 <br />NAME 490-74 TITLE <br />490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the ownedoperator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER(OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information vided herein is true and accurate to the best of m knowledge. <br />APPLICANT SIGNATURE 49oa6 <br />DATE:: <br />490.77 <br />l�l�l(( ol <br />490-79 <br />APPLICANT NAME (print): <br />APPLICANT TITLE: <br />410,79 <br />cy� , �" <br />D 1 ' qp-- <br />UPCF UST -D (12/2007) 3/4 <br />