Laserfiche WebLink
, <br />SWRCB, January 2002 <br />Page 3 of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />13 Other (Spec) <br />Test Method Used: <br />�yPressure <br />/❑`Other <br />0 Vacuum 0 Hydrostatic <br />(Specify) <br />Test Equipment Used: fe SS uv'p- <br />E ui ment Resolution: t <br />q p /U1Y,✓)5. <br />Piping Run #I <br />Piping Run # 2— Npiping Run #'Piping Run # <br />Piping Material:] <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />o D <br />Y -v -2,9 r <br />Product Stored: <br />{ I <br />I <br />Method and location of <br />T -c! -y <br />i in -run isolation: <br />S a. <br />e between applying <br />ressure acuum/water and <br />1 <br />startin test: <br />3 � s.►. ,.e.a� -c s <br />36 x �, � �>.,c � - 5 <br />Test Start Time: <br />q: 00 <br />D f <br />Initial Reading (111): <br />a P 5.1. <br />P 5T <br />Test End Time: <br />_1,0" vv <br />IU 00 <br />Final Reading (RF): <br />Test Duration <br />C <br />Change in Reading (RF -R,): <br />5 --t. <br />S <br />Pass/Fail Threshold or <br />Criteria: <br />N 4 L oS S Ty\ S -'.1= <br />Test Result: <br />Pass ❑ Fail <br />EPass 0 Fail❑Pass ❑ Fai ❑Pass ❑Fail <br />Comments — (include information on repairs made <br />prior to testing, and recommended follow up or failed tests) <br />