Laserfiche WebLink
01W-" i.ng System Certification <br />Q <br />Site Address: Date of `resting/Servicing: <br />F. In-Tank Gauging/ SIR Equipment: Check this box if tank gauging is used only for inventory'control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />[COYes <br />❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ No* Was accuracy of system product level readings tested? <br />❑ No* Was accuracy of system water level readings tested? <br />❑ No* Were all probes reinstalled properly? <br />❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ N/A (Check all that apply) Simulated leak rat 3 g.p.h.; ❑ 0.1 9-p-h ; ❑ 0.2 g.p.h. <br />Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes ❑ No* Was the testing apparatus properly calibrated? <br />Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes ❑ N * For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes ❑ o* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A or disconnected? <br />❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />/A malfunctions or fails a test? <br />❑ Yes ❑ NO * For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section ill, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />