Laserfiche WebLink
41 <br />• <br />S <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 2 <br />vI.DI pEN E� 1VIf3NJTORING <br />MONITORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) M50. <br />,a_ 1. CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: 6a--aI- :�� �""r— M51. MODEL #: M52. <br />LEAK SENSOR MANUFACTURER: M53 MODEL #(S): M54. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a. YES ❑ b. NO Mss. <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M56. <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO M57. <br />0-2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />ASSEMBLY MANUFACTURER: 00;0 y V �C�`/�_ Mss. MODEL #(S): M59. <br />❑ 3.VISUAL MONITORING DONE: ❑ a. DAILY ❑ b. WEEKLY (Requires agency approval) M60. <br />❑ 4. NO DISPENSERS <br />❑ 99. OTHER (Specify) M61. <br />VII. ENHANCED LEAK DETECTION <br />❑ 1. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIIY. TRAINING <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) Mao. <br />1. r -B- THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3.THE FACILITY'S BEST MANAGEMENT PRACTICES (Required as of 1/01/2005) <br />4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. ALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" <br />7. ❑ SWRCB PUBLICATION: "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ OTHER (Specify): M81. <br />Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br />By January 1, 2005 this facility will have a "Designated UST Operator" who has passed the operator exam administered by the International Code Council (ICC). By <br />January 1, 2005, and annually thereafter, the "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems. <br />This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the leak detection equipment. <br />Y The facility employee's role with regard to spills and overfills. <br />➢ Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after January 1, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDITIONAL INFORMATION <br />Please use this section to include any additional UST system monitoring -related information (e.g., additional information required by your local agency): Mss. <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF 111/05, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION - <br />FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br />EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br />UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XL OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br />OWNER/OPERATOR SIGNATURE REPRESENTING <br />DATE: M91. <br />❑ Owner M9o. <br />r _' <br />�j i { 0 `�/ <br />I / <br />❑ Operator <br />OWNER/OPERATOR NAME (print): M92. <br />OWNER/OPERATOR TITLE: M93. <br />(Agency Use Only) This plan has been reviewed and: Approved ❑ Approved With Conditions Disapproved <br />Local Agency Signature: /- /teDate: "/ <br />�- <br />Comments/Special Conditions: <br />SJCEHD-d (07/03) - 3/4 <br />07/23/03 <br />