My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2002-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 3:24:31 PM
Creation date
6/23/2020 6:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2012
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2002-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />0 <br />Form i <br />Source Test Results <br />Static Leak Test <br />Date: 12/24/2004 Time: 05:50 Application No. <br />GDF Name and address: LODI 1725 ACKERMAN DR <br />Stage H system (check one): Vapor Balance [ X ] Single Hose M.P.D. [ X ] <br />Vacuum Assist [ ] Type: <br />Stage I type (check one): Two point { X ] Manifokled? Yes [ ] <br />Coaxial [ ] Nn r X 1 <br />Tank # <br />1 <br />Product grade <br />REGULAR <br />Actual tank capacity (gallons) <br />2761 <br />2761 <br />Gasoline volume (gallons) <br />210$ <br />2108 <br />Ullage (gallons) <br />653 <br />653 <br />Initial pressure of UST, inches H2O <br />2 <br />2 <br />Number of nozzles served by tank <br />1 <br />1 <br />Test location: (A) Stage I vapor <br />coupler of (B) Stage II riser <br />B <br />Initial Pressure, inches H2O (2.0) <br />2 00 <br />Pressure after 1 min. (inches H2O) <br />192 <br />Pressure after 2 min. (inches H2O) <br />1.86 <br />Pressure after 3 min. (inches H2O) <br />1.81 <br />Pressure after 4 min. (inches H2O) <br />1.77 <br />Final Pressure after 5 min. (inches <br />H2O) <br />1.74 <br />Allowable Final Pressure: Table l A, <br />Table 1B, Equations 9.1, 9.2 <br />63 <br />Test Status [Pass or Fail] <br />Pass <br />Tests Conducted By: RSANTOS <br />Test Company: TANKNOLOGY Date of Tests: 12/24/2004 <br />Tests Witnessed By: MIKE <br />GENSII - Rev 8/7/2002 Work Order #: 2233658 <br />
The URL can be used to link to this page
Your browser does not support the video tag.