Laserfiche WebLink
T 1�:Tank Gauging /SIR Equi0ent: U-CC-h-eck this box if tai inventory gauging is used only for inventocontrol, <br />IU Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perforin leak detection monitoring. <br />Complete the following checklist: <br />El Yes El No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />13 Yes El No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />13 Yes Q No* Was accuracy of system product level readings tested? <br />Q Yes 13 No* Was accuracy of system water level readings tested? <br />Q Yes 0 No* Were all probes reinstalled properly? <br />Q Yes 13 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section.H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Complete the following checklist: <br />Q Check this box if LLDs are not installed. <br />0' -Yes <br />L3 <br />13 <br />No* <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: Eff g.p.h.; 13 0.1 g.p.h ; El 0.2 g.p.h. <br />CY—Yes <br />E3 <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirei6ents? <br />M —es <br />Y <br />13 <br />No* <br />Was the testing apparatus properly calibrated? <br />Yes <br />13 No* <br />0 NIA <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />U Yes <br />Q <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />%.a 1 -urs ! <br />0 Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabi <br />Cr`R/A or disconnected? ed <br />U Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />0 Q -%/A I malfunctions or fails a test? <br />U ; Yes _0 for electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes �d_Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />Page 3 of 3 <br />8 <br />03/01 <br />