Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />I. FACILITY INFORMATION <br />Facility Name: KISHIDA TRUCKING Date of Testing: 11-15-11 <br />Facility Address: 1725 ACKERMAN DRIVE <br />Facility Contact: KELLIE Phone: 209-368-0603 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (af present during testing): SAN JOAQUIN CO ARIS <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: AFFORDA TEST 4162 nd Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ❑ Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: <br />® Hydrostatic <br />❑ Vacuum <br />Other <br />Test Equipment Used: TAPE H2O <br />Identify Spill Bucket (By Tank 1 DIE <br />Number, Stored Product, etc. <br />2 DIE <br />Equipment Resolution: <br />3 <br />1/16 <br />4 <br />Bucket Installation Type: <br />Direct Bu <br />®recBury <br />El Contained in Sump <br />® Direct Bury <br />El Contained in Sump <br />El Direct Bury <br />❑ Contained in <br />Sump <br />❑ Direct Bury <br />❑ Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />11 <br />Bucket Depth: <br />18 <br />18 <br />Wait time between applying <br />vacuum/water and start of test: <br />Test Start Time (TI): <br />900 <br />900 <br />Initial Reading (Ri): <br />171/2 <br />171/2 <br />Test End Time (TF): <br />1000 <br />1000 <br />Final Reading (RF): <br />171/2 <br />171/2 <br />Test Duration (TF — TI): <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - RI): <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />N Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ElFail <br />El Pass <br />❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />QPW BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technicians Signature: 11-15-11 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local <br />requirements may be more stringent. <br />