My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2002-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 3:24:31 PM
Creation date
6/23/2020 6:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2012
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2002-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />D. Restaits of Testing/Servicing <br />Software Version Installed: <br />r.,., l.tn +np fniiowina checklist: <br />C <br />® Yes <br />❑ No' <br />Is the audible alarm operational? <br />is the visual alarm operational? <br />visually inspected, functionally tested, and nfirmed operational? <br />® Yes <br />❑ No` <br />® Yes <br />❑ No' <br />Were all sensors <br />Were all sensors installed at lowest point of secondary corlitainment and positioned so that other equipment will not interfere with their proper <br />® Yes <br />❑ No' <br />operation? <br />If alarms are relayed to a remote monitoring station, is all co munications equipment (e.g., modem) operational? <br />❑ Yes <br />❑ No' <br />® Yes <br />® N/A <br />El No* <br />For pressurized piping systems, does the turbine automatic ily shut down if the piping secondary containment monitoring system detects a leak, <br />If w ich sensors initiate positive shut -down? (Check alt that apply) ® Sumpfrrench <br />❑ N/A <br />fails to operate, or is electrically disconnected? yes: <br />Sensors; ❑ Dispenser Containment Sensors. <br />Did confirm shut -down due to leaks and sensorfailure/disconnection? ❑Yes; ®No. <br />you positive <br />it ring stem as h tank overfill I prevention valve is <br />nt(s) andnope operating properly? If mechanical <br />For tank systems what percent of tank capacity <br />and fill <br />❑ Yes <br />❑ No* <br />® N/AI <br />atprimary <br />installed), istheoverfilluwlarningealarm visible audible the tank point(s) <br />does the alarm trigger? <br />s ecific sensors, pand robes, or other equipment replaced and list the manufacturer name <br />Wasreplaced?Ifa <br />equipment replan <br />smodemon toi <br />® No <br />El Yes <br />for replacement parts Section below. <br />Was liquid found inside any secondary containment system a designed as dry systems? (Check all that apply) <br />❑Yes' <br />® No <br />❑ Product; ❑ Water. If yes, describe causes in Section E, below. <br />Was monitoring system set-up reviewed to ensure proper s ttings? Attach set up reports, if applicable <br />Is all monitoring equiprnent operational per manufacturer's pecifications? <br />® Yes <br />❑ No* <br />® Yes <br />❑ No* <br />
The URL can be used to link to this page
Your browser does not support the video tag.