My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACKERMAN
>
1725
>
2300 - Underground Storage Tank Program
>
PR0231309
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 4:20:10 PM
Creation date
6/23/2020 6:45:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231309
PE
2361
FACILITY_ID
FA0003756
FACILITY_NAME
KISHIDA, GEORGE INC
STREET_NUMBER
1725
STREET_NAME
ACKERMAN
STREET_TYPE
DR
City
LODI
Zip
95240
APN
06219001
CURRENT_STATUS
01
SITE_LOCATION
1725 ACKERMAN DR
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231309_1725 ACKERMAN_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 0 0 <br />F. In -Tank Gauging / SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br />E] Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* In the hection H, Deiow, ciescritie now ano wnen inese ueuctuncivj wcru ur Will UV %;Vl I WA MU. <br />Cnmnlete the fallowinp checklist: <br />84 <br />i.Has <br />all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />All <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Was accuracy of system product level readings tested? <br />Was accuracy of system water level readings tested? <br />Were all probes reinstalled property? <br />103 <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the hection H, Deiow, ciescritie now ano wnen inese ueuctuncivj wcru ur Will UV %;Vl I WA MU. <br />Cnmnlete the fallowinp checklist: <br />84 <br />�01 <br />For equipment start-up or annual equipment certiflcation, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: JD3 g.p.h.; 0 0. 1 g.p,h ; El 0.2 g.p.h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus property calibraied? <br />103 <br />1 For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />rNOM111=1 <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />system is disable <br />or disconnected? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Pj <br />Um; <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or wni ue torr feu. <br />IWRT"1 1� <br />Monitoring Certification Test Report 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.