My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:12:40 PM
Creation date
6/23/2020 6:46:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page / of Z <br />Test Method Developed By: 0 Piping Manufacturer industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: Pressure ❑ Vacuum ❑ Hydrostatic <br />' ❑Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Run # <br />fiStZ'' <br />Piping Run # 2 <br />Piping Run # 3 <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer: L)IL <br />0 F^- <br />vk, <br />Piping Diameter: 2 '' <br />Z <br />Length of Piping Run: 5^0 <br />5,8 <br />Product Stored: - t t;'$ i&L <br />Method and location of <br />piping -run isolation:+?—<^i S'vry� <br />�.1 �P <br />Qet7�I'� <br />'�Sfr(�a"risP <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: /'n r2 <br />r16 <br />Test Start Time: p <br />i <br />`® or <br />Initial Reading (RI): ff( /S <br />5u.S <br />Test End Time: ze) <br />7 YCo <br />/p ®o <br />Ig - <br />Final Reading (RF). <br />Test Duration: r <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or <br />Criteria: <br />TCSt Results ❑ Pass ail <br />❑'.'Pass . `: ail . <br />"Pass . ;, Tari <br />17 Pass ". Ail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.