My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec6) <br /> Test Equipment Used:Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-15 PSI <br /> Piping Run#5 Piping Run#6 Piping Run#7 Piping Run#8 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: Approx.75' Approx.35' Approx. 100' Approx.65' <br /> Product Stored: Regular 87 Regular 87 Vent Gasoline Vapor Diesel-T-4 <br /> Method and location of Test boots at <br /> i in -run isolation: Test boot at STP#3 Test boot at Vent Box STP#2&3 Test boot at STP#4 <br /> Wait time between applying 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:15 10:55 11:20 9:40 <br /> Initial Reading(Rj): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:15 11:55 12:20 10:40 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi 3 Psi <br /> Test Duration: I Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> TesrRes�ulf X Pais- „f�Fail X Pass_r_,❑Fad X pass ❑Fair .. X Passe Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.