My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,'January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> 74599 <br /> ump# 1 Sump#2 Sump#3 Sump#4 <br /> Sump Diameter: 2" 42" 42" 42" <br /> Sump Depth: 39'/2" 38" 37" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16" 20" 22" 18'/z" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 15" 15" 15" 13'/a" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Line 18" Water Line 23" Water Line 24" Water Line 20'/2" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No 0 NA X Yes ❑No DNA X Yes ❑No ❑NA X Yes No DNA <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe X Yes 0 No ❑NA X Yes ❑No DNA X Yes ❑No DNA X Yes 0 No 0 NA <br /> shutdown?° <br /> Was fail-safe verified to be Yes X No DNA Yes X No ❑NA Yes X No ❑NA 0 Yes X No 0 NA <br /> o erational?` <br /> Wait time between applying water 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> and starting test: <br /> Test Start Time: 9:40 9:35 9:00 8:55 <br /> Initial Reading(Ri): .001 .001 .001 .001 <br /> Test End Time: 10:10 10:05 9:30 9:25 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> 77 7�,77777,gi7 <br /> Test ResttCt; .`. z 3.,:,.11 Ftl` <br /> .1' ss,: ,CI Feil , Pass; l3 E'ail X ,Pass "".':❑Fail <br /> Was sensor removed for testing? X Yes 0 No 0 NA X Yes ❑No ❑NA X Yes 0 No DNA X Yes 0 No DNA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No DNA X Yes 0 No DNA X Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.