Laserfiche WebLink
mandatory immersion period and shall exhibit A5.1 SITE PREPARATION. <br /> no evidence of peeling, blistering, surface <br /> wrinkling or roughing. A5.1.1 Prior to excavation, the site shall be <br /> safeguarded from all sources of ignition for an <br /> A4.6.1.3.2 Each liquid post immersion test area of at least 25 feet in all directions. Until the <br /> sample which is adhesion tested in accordance area is vapor free, all open flame and spark <br /> with ASTM D4541-85 shall have a bond producing equipment within the area shall be <br /> strength of no less than 100 psi; and shut down. Barricades and warning signs <br /> reading Flammable - No Smoking shall be <br /> erected and posted around the vapor area. <br /> A4.6.1.3.3 Other Physical properties after the <br /> final immersion period for the above listed <br /> "Additional Liquids shall be not less than 30 A5.1.2 Fire Extinguisher. Two portable A:B:C: <br /> percent of the original physical properties type fire extinguishers each having a rating not <br /> before immersion with a stable trend indicating less than 80B:C shall be provided on the site in <br /> little or no further long-term deterioration and accordance with N.F.P.A. <br /> shall in no case be less than 50 percent of the <br /> original physical properties for any liquid to be <br /> stored in the tank. A5.1.3 Emergency Communications. A <br /> dependable method shall be available for <br /> notifying the fire department or life squad in the <br /> A4.7 HISTORICAL PERFORMANCE TEST event of an emergency. <br /> (Empirical Data) <br /> A5.1.4 Static Electricity Control. Adequate <br /> A4.7.1 For linings that have been successfully precautions shall be taken to prevent the <br /> in service for 5 years or more in underground accumulation and discharge of static electricity <br /> tanks, the manufacturer of the lining may (See NFPA 77, Recommended Practice on <br /> document to the tank owner the compatibility of Static Electricity). <br /> the lining material to the product to which the <br /> lining has been exposed. An internal inspection <br /> of the lining that has been in service for 5 years Note: Electrically isolated tanks such as tanks <br /> or more which meets the visual requirements of constructed of fiberglass, <br /> section A4.6.1.3.1, meets the adhesion test fiberglass composite, or ether <br /> requirements of section A4.6.1.3.2, passes a non-conductive material cannot <br /> holiday test as described in section A13.1.3, be relied upon as a grounding <br /> and retains a minimum of 50% of the original source. Grounding potential <br /> cured hardness of the lining material at time of should checked by a structure <br /> application shall meet the material compatibility to soil potential reading. <br /> requirements of A4.4. <br /> A5.1.5 Electrical Equipment.During site <br /> preparation,all electrical equipment used in the <br /> A5.0 GENERAL SAFETY <br /> REQUIREMENTS <br /> In <br />