Laserfiche WebLink
wall in all directions. The lining resin shall be <br /> Note: The above tank metal thicknesses are the worked completely into the fiberglass until the <br /> metal thickness requirements specified in UL - fiberglass is free of any entrapped air bubbles <br /> 58,table 3.1 and section 3.6. exceeding 1/8 inch in diameter. <br /> A10.4.5.6 Seams or joints repairs shall be Al 1.0 SURFACE PREPARATION <br /> continuously welded. For a description of joints <br /> see UL-58 Steel Underground Tanks, Section All.l Just prior to application of the lining, the <br /> 5.1. tank shall have a white metal finish<see SSPC- <br /> SP5 or s.s.s., a3 blast standards>, defined as a <br /> surface with a gray-white uniform metallic color, <br /> A10.4.5.7 Repaired areas shall be abrasive roughened to a minimum 2-1/2 to 4 mil anchor <br /> blasted to white metal in accordance with profile pattern. The surface, when viewed <br /> section All.0 and covered with fiberglass without magnification, shall be free of all oil, <br /> matting imbedded with resin extending at least grease, dirt, visible rust, scale, corrosion <br /> 6'beyond the perimeter of the repair. products, oxides, paint or other foreign matter <br /> (See figure 5.0). All procedures in section A9.0 <br /> shall be followed. <br /> Al 0.4.6 REPAIRS BY PLUGGING <br /> A10.4.6.1 Perforations not repaired in <br /> accordance with the weld repair procedures of A11.2 Abrasive blast cleaning operations for <br /> A10.4.5 shall be sealed using boiler plugs lining shall not be conducted on surfaces that <br /> and/or hydraulic cement. will be wet after blasting and before application <br /> of the lining material. When the surface is less <br /> than 5% above dew point, or when the relative <br /> A10.4.6.2 Hydraulic cement shall not overlap humidity of the air in the tank is greater than <br /> perforation(s) by more than 2 inches, nor 85%, abrasive blasting operations shall not be <br /> protrude up from the tank's interior surface performed. <br /> more than 2 inches. <br /> Al 1.3 Operating air pressure during abrasive <br /> blasting shall not be less than 90 PSIG and a <br /> A10.4.6.3 Areas to be sealed with boiler plugs minimum of 18 mesh-grit blasting media shall be <br /> and/or hydraulic cement shall be abrasive used to establish the minimum anchor profile <br /> blasted to white metal around the boiler plug pattern for the lining. <br /> and/or hydraulic cement for at least 12 inches in <br /> all directions. The boiler plug(s) and/or <br /> hydraulic cement shall be covered with lining <br /> resin and fiberglass chopped strand matting with A11.4 Prior to, or after, application of lining <br /> a minimum weight of 3 oz/ft or greater which is material, a minimum 7 gauge thick steel <br /> silane treated. The fiberglass and lining resin reinforcing plate, rolled to the contour of the <br /> shall extend from the outermost edge of the tank, and with minimum dimensions of eight <br /> boiler plug and/or hydraulic cement a minimum inches by eight inches shall be installed under <br /> of five inches and be bonded to the metal tank the fill(drop)tube(s)and gauging tube(s).The <br /> 21 <br />