My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> plate shall be attached with lining material and Al2.4 If a heater is used to accelerate the <br /> the top covered with fiberglass matting curing process, all other work that might release <br /> embedded with lining material extending at least flammable vapors in the work area shall be <br /> 6 inches beyond the perimeter of the plate. halted. The heating unit shall be attended <br /> whenever it is in operation. <br /> A11.5 The surface shall be lined or primed <br /> within eight hours after blasting and before any A13.0 TESTING <br /> visible rusting occurs. <br /> A13.1 Upon completion of the application of <br /> Al2.0 APPLICATION OF THE LINING the lining to a steel tank,the following tests shall <br /> MATERIAL be performed: <br /> Al2.1 Lining materials shall meet the A13.1.1 Lining thickness testing shall be <br /> requirement of section A4.4. performed using an magnetic, non destructive <br /> lining thickness gauge, or other acceptable <br /> Al2.2 Manufacturer's specifications are to be instrument with a minimum accuracy of plus or <br /> followed on handling and mixing of resin minus 10%. The lining thickness shall meet the <br /> compounds, and the compounds shall be requirements of Al2.3. <br /> applied to the entire interior surface of the tank <br /> by the manufacturer or his authorized contractor <br /> or contractor's qualified person or NLPA A13.1.2 Lining hardness tests shall be <br /> certified special inspector following the performed using a Barcol Hardness Tester, <br /> specified method of application. GYZJ 935, or other acceptable instrument to <br /> determine that the lining has cured to a hardness <br /> that meets the manufacturers specifications for <br /> product storage. <br /> Al2.3 The lining shall be applied to the <br /> entire interior tank wall surface to a <br /> minimum thickness of one hundred (100) <br /> mils and a nominal thickness of one hundred <br /> and twenty-five (125) mils at the <br /> recommended application temperature. A13.1.3 An internal inspection tightness test of <br /> the steel tanks interior shall be performed using <br /> a Holiday Detector with a silicon brush <br /> electrode, or other acceptable instrument to <br /> ensure the absence of air pockets, leaks or pin <br /> Note: A minimum lining thickness is required. holes in the lining. The internal inspection <br /> The lining provides additional structural strength tightness test shall be conducted at a rate of at <br /> to the tank walls by forming a composite tank. least 100 volts per mil of nominal lining <br /> A 125 mil lining provides a solid structural thickness but in no case less than 12,500 volts, <br /> barrier that can bridge future holes in the outer nor more than 35,000 volts. The internal <br /> steel tank shell which develop due to external inspection tightness test of the lining (after any <br /> corrosion during the operational life of the tank. repairs to the lining should holidays have been <br /> previously detected) must not detect any <br /> holidays.Any holidays in the lining shall be <br /> 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.