My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LINING TEST CERTIFICATION <br /> I have performed an internal inspection on the lining and certify that the following tests were <br /> conducted in accordance with Section 13.0,Chapter A of NLPA 631: <br /> 1) The lining was holiday tested and free of holidays. <br /> 2) The barcol hardness of the lining met the lining manufacturers barcol hardness specifications. <br /> 3) The final lining thickness had a nominal thickness of 125 <br /> mils and a minimum thickness of no less than 100 mils. <br /> Signed Date <br /> SPECIAL INSPECTOR'S SIGNATURE <br /> OWNER VERIFICATION <br /> By signing below, the tank owner or his designated agent has verified that this form has been <br /> properly completed with all required signatures and acknowledges receipt of this affidavit. Owner <br /> should send a copy of this Affidavit to the lining material manufacturer for authentication and <br /> maintain the original signed affidavit as part of his tank records. <br /> Note: Under applicable federal law, it is the tank owners responsibility to determine that his tank <br /> meets the requirements for valid upgrade and to maintain records that demonstrate his tank is in <br /> compliance with the upgrade requirements. <br /> Date <br /> Owner or Authorized Agent Signature <br /> SEND COPY TO:NLPA <br /> P.O.Box 1643. <br /> Boise,ID 83701-1643 <br /> PAGE 3 of 3 <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.