State Water Resources Control Board Page 4 of 6 <br /> 9.Within 6 months of construction in the vicinity of any cathodically-protected UST system,the cathodic protection system tested by <br /> cathodic protection tester in accordance with a voluntary consensus standard. <br /> 10.Installation,testing,and monitoring records maintained for remaining operating life of tank. <br /> [Enclosure 3] <br /> EXAMPLE PLAN CHECK FOR TANK LINING <br /> 1.Obtain a complete third-party evaluation of the lining material and procedures: <br /> a.A resume,including all applicable formal training experience,from personnel who conducted the evaluation(not necessary for <br /> Underwriters Laboratories). <br /> b.An affidavit from the company that received the third-party evaluation confirming that there are no mutual financial interests between <br /> lining company and testing organization(not necessary for Underwriters.Laboratories). <br /> c.A description of the testing organization's formal periodic inspections of the listed/certified materials and processes.(The purpose of the <br /> formal periodic inspections is to ensure that the listed/certified materials and process continue to comply with the listing/certification.) <br /> d.A copy of the voluntary consensus standard that was used during the evaluation or a description of the equivalent test protocol,if a <br /> voluntary consensus standard was not used. <br /> e.The testing organization's raw field data, laboratory results,calculations,graphs,charts,etc. <br /> f.The conclusion of the testing organization's evaluation of the lining material. <br /> g.The conclusion of the testing organization's evaluation of the lining process. <br /> h.Limitations on the listing/certification, if any. <br /> i.A statement from the testing organization confirming that all equipment at the test site(s)was properly maintained and calibrated to the <br /> level of accuracy necessary for a valid evaluation. <br /> j.A statement from the lining applicator confirming that the materials that will be used are the same materials that were evaluated by the <br /> testing organization. <br /> k.A statement from the lining applicator confirming that the processes that will be used are the same processes that were evaluated by <br /> the testing organization. <br /> I.A description of tank lining processes to be used by the applicator. <br /> m.A statement from the company that received the evaluation describing training provided to the authorized applicator. <br /> 2. Does lining applicator have one of the following valid,unexpired contractors licenses: <br /> General Engineering Contractor(A) <br /> General Building Contractor(B) <br /> Limited Specialty/Service Station Maintenance(C-61040) <br /> %>Limited Specialty/Synthetic Products(C-61/D12) <br /> >"Limited Specialty/Protective Coating(C-61051) <br /> Painting and Decorating(C-33) <br /> >'Plumbing Contractor(C-36) <br /> 3. Is lining a preventive upgrade or a repair of a leaking tank? <br /> >%Results of soil samples <br /> r'Holes that may have leaked fuel detected by special inspector <br /> Results of tank integrity tests <br /> -%Other monitoring results <br /> 4.Corrective action, if necessary.Will lining inhibit or delay corrective action, if any? <br /> 5.A guideline provided by lining company for local agency inspectors to use when conducting field inspections of tank linings. <br /> 6.Certification by special inspector that the tank is suitable for lining and continued use: <br /> http://www.waterboards.ca.gov/water issues/programs/ust/leak—Prevention/Igs/136_I.shtml 2/17/2010 <br />