Laserfiche WebLink
• <br /> -• r <br /> „ � i i i � � � r � i � j i r i r ► + . <br /> Faci Ity Name, Inspection Date: <br /> Facility Address: Service Request <br /> r � <br /> f�" r <br /> ICC Service Technicianlinstaller Exp. <br /> SERVICE <br /> Leak detector <br /> ■ Model: <br /> • ■ gallon <br /> ■ ■electronic Serial#: ■ 1 hour hydrostatic ■ Incon <br /> ■ Caldwell System 0 Other <br /> 0 line test programmed <br /> Leak detector <br /> _Spillbucket ■ minimum 5 gallon <br /> ■ mechanical Model: <br /> 0 electronic Serial#: ■ Caldwell System 0 Other <br /> ■ line test programmed <br /> Leak detector <br /> Spill0 mechanical Model: bucket ■ minimum 5 gallon <br /> 0 electronic Serial#: 0 1 hour hydrostatic 0 Incon TS-STS■ Caldwell System 0 Other <br /> sensor0 line test programmed <br /> ■ ■ positive shutdown Model: <br /> ■ fail safe Serial#: • <br /> _ <br /> ■ NA <br /> sensor Secondary containment testing for: <br /> ■ : ■ positive •• ffUDC(s) Piping <br /> ■ fail safe <br /> Serial Sump(s) <br /> 0 NA Testing for the above components are next due by: <br /> ■ .: -.: be tested <br /> installation,6 months after,and every 36 months thereafter. <br /> Drop tube with mechanical overfill at 95% Cold start of monitoring panel <br /> Drop tube with mechanical overfill at 95% 9 10MWill! <br /> 4 s ` <br /> � `� Cpm �.G � ►.� _ ll�,�/� g , �. <br /> fit+ �• � i �i��� <br /> is <br /> 11ART <br /> _+ «,j�HOURLY RATE. <br /> AM <br /> �1 �c <br />