My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAID. <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained b -EHD) <br /> 1. .Site map enclosed? YES.[7 NO[]. <br /> 2.. u mit copies of ICC Service Technician and/or Installers certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is,available on the 7obsite as required by Ti#6 8. <br /> 3. ..Detailed description ofiwork to be completed. List.com <br /> tponentsto be repaired or replaced and attach a diagram drawn <br /> o.scale:showing location of repairs andlorreplacerrients If repairing a.component, describe how this will:be done. (If. <br /> adding piping, UDC's, or other-UST equipment, or performing tank lop upgrade; use,the:IJST lnstallafion Applicaffon <br /> pages 4=8 as necessary fora timely plan review): <br /> -------------- <br /> 4. List of equipmenfto be used(Attach..manufacturer's specification-she'efs showing third-party approval): <br /> V 40 Q <br /> 2, <br />
The URL can be used to link to this page
Your browser does not support the video tag.