My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2022 2:52:45 PM
Creation date
6/23/2020 6:46:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dispenser 11/12 Dispenser 25/24 <br /> Dispenser 13/14 Dispenser 26/25 <br /> Dispenser 15/16 Dispenser 27/26 Satellite <br /> Dispenser 17/18 Dispenser 27 <br /> Faciflty Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job training within the past year. X <br /> All facility employees hired within the past 30 days have received the required on the job training. X <br /> MonMy Inspection— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 6-25-10 <br /> Spill Bucket testing completed(within past 12 months) X 6-25-10 <br /> Leak Detector-mechanical/electronic for most sites(within past 12 months) X 6-25-10 <br /> The above are usually done together on an annual basis for local regulator. <br /> Line Tightness(usually upon construction or when no positive shutdown) <br /> Tank Tightness(Usually only after construction or when using SIR) <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X 8/12/08 <br /> Other testing or maintenance completed as required.List them below: <br /> Test/Maintenance:AQ X 2-2-11 <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> PRINTOUT INCLUDED Yes® No ❑ NA El <br /> Comments:PRINT OUT ON SITE <br /> WATER IN FILL SUMP MARCH 26.REMOVED BY SITE <br /> Items Requiring Follow-up Actions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.