Laserfiche WebLink
Facility Employee Training Page 2 of 2 <br /> All facility employees have received the required on-the-job training wOm the past year. X <br /> AM facility employees hired within the past 30 days have received the requved on the job training g <br /> Monthly Inspection— <br /> Y N NA Date Done <br /> Monitoring system certification(within past 12 months) X 6-27-17 <br /> Spill Bucket testing completed(within past 12 months) X 6-27-17 <br /> Leak Detector-mechamcal/electromC for most sites(within past 12 months) X 6-27-17 <br /> The above are usually done together on an amncal basis for local regulator. <br /> Line Tightness(usually upon consbuucdon or when no positive shutdown) X <br /> Tank Tightness(Usually only after construction or when using SIR) X <br /> Secondary containment(SB989)tests have been completed(usually every 3 years) X 8-23-17 <br /> Other tasting or maintenance completed as required List them below: <br /> Test/Maintenance: <br /> TesttMaintenanc:e: <br /> Te ce: <br /> PRINTOUT INCLUDED: Yes® No ❑ NAE]BINDER ITP TO DATE: <br /> Comments: <br /> Items RequHng Follow-up Actions: <br /> Monthly inspection must be conducted by an ICC licensed Designated Operator. <br /> A copy of this checklist must be provided to UST owner or operator,but not to State Water Resources. <br /> Designator Operator must alert the UST owner or operator of any condition discovered during the monthly <br /> inspection that may require that may require follow-up action. <br /> UST owner or operator must maintain a copy of this monthly inspection and any attachments for the previous <br /> 12 months.Records must be maintained on-site or,if approved by the local agency,off-site at a readily <br /> available location. <br />