Laserfiche WebLink
RECE41P1VPD <br /> JL1i_ 17 f' 8 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan E ftON MrBNI T A <br /> HEALTH Ds.:.. r ir.1.N <br /> Site Address: VAN DE POL 361 N.BECKMAN ROAD LODI CA 96240 <br /> HIGHWAY 99 N —jo- <br /> KEY *PIPING* . . . . . TLS 350 <br /> A=ANNULAR Sensor (ARROWS) <br /> F=FILLS Drawing of . . . . . . . . CAS <br /> V=VAPOR piping exit of . . . • • • . • • <br /> P=PROBE sump and UDC's. . • • • . . • • • • • . . • <br /> L=Turbine/Leak Detector No underground • • • 00000 • • . . . • <br /> X=SUMP SENSOR drawing is . . . . . . . . . . . . . . . . . . . . . VENTS. . <br /> B=Brine Sensor accurate,we vEnT sunlr <br /> S=Smart Sensor cannot speculate . . _ . • , . . . . . • . . . . . . . . . . . . . . . . . . . . <br /> C=Floats&Chains blue prints. . . . . . . . . . . . . . . . . . • , . _ . , • <br /> E=E Stop <br /> JT <br /> OIL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . P . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1 X L . . . . <br /> 3 N <br /> I4 2 L X L99�E <br /> . . . . . . . . . � . . . . <br /> X Q <br /> N L al <br /> X <br /> . . . . . . . . . . . . . . . . . . L a F X <br /> . . . . . . . . . . . . . . . . . . . X 1Q . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . L X . . . . . . . . <br /> Qv . . . . . . . . . . . <br /> . . . . . . . F . . . . . . . . . . . . . <br /> . . . . . . . . 7. .5 . . X V <br /> . . . . . . . . x x Q Q <br /> . <br /> . <br /> 8. . . . . 6. . . . . X . . . . . . . . . . . . . . <br /> 9. . . . . . . . . . . . . . . . . . . . -14 . . . . . . . <br /> F . . . . . . . . . 351 N.BECKMAN ROAD <br /> x <br /> . . . . .10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map was drawn: 6-24-16 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). in the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />