My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
351
>
2300 - Underground Storage Tank Program
>
PR0231310
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2022 4:33:55 PM
Creation date
6/23/2020 6:46:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231310
PE
2361
FACILITY_ID
FA0003773
FACILITY_NAME
VAN DE POL ENT INC/PACIFIC PRIDE
STREET_NUMBER
351
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04903015
CURRENT_STATUS
01
SITE_LOCATION
351 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231310_351 N BECKMAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />9_ CF.CONDARV PIPE TF,STING <br />Page of <br />Test Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: X Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run # 3 Piping Run # 4 <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith Smith <br />Piping Diameter: <br />3" <br />3" <br />3" 3" <br />Length of Piping Run: <br />Approx. 80' <br />Approx. 20' <br />Approx. 85' Approx.25' <br />Product Stored: <br />Dyed Diesel <br />Dyed Diesel Vent <br />Premium 91 Premium 91 Vent <br />Method and location of <br />i in -run isolation: <br />Test boot at STP <br />Piping Sump #1 <br />Test boot at Vent Box <br />Test boot at STP <br />Pi in Sump #2 Test boot at Vent Box <br />Wait time between applying <br />pressure and starting test: <br />1 10 Minutes <br />10 Minutes <br />10 Minutes 10 Minutes <br />Test Start Time: <br />8:50 <br />9:00 <br />9:10 9:20 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />5 Psi 5 Psi <br />Test End Time: <br />9:50 <br />10:00 <br />10:10 10:20 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi 5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour 1 Hour <br />Change in Reading (RF-Ri): <br />0 Psi <br />0 Psi <br />0 Psi 0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi No Loss in Psi <br />Test Result: <br />Pass <br />Pass <br />Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow,'= forLiled tests) <br />erg <br />
The URL can be used to link to this page
Your browser does not support the video tag.