Laserfiche WebLink
SWRCB, January 2002 Page of <br />13. PIPING SUMP TESTING <br />Test Method Developed By: <br />Test Method Used: <br />Test Equipment Used: Caldwell Le <br />Sump Diameter: <br />Sump Depth: <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />Was fail-safe verified to be <br />operational?* <br />Wait time between applying water <br />and startingtest: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -RI): <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />Was sensor removed for testing? <br />Was sensor properly replaced and <br />verified functional after testing? <br />[I Sump Manufacturer ❑ Industry Standard X Professional Engineer <br />11 Other (Spec) <br />11 Pressure ❑ Vacuum X Hydrostatic <br />El Other (Specie) <br />Lev <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to m of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />Change Indicator <br />Equipment Resolution: .002 <br />Sump# 5 -Diesel -A -B <br />Sump # <br />Sump # <br />Sump # <br />42" <br />k <br />3 6 ''/Z„ <br />Fiberglass <br />l# 3i . <br />22" <br />12" <br />... <br />Dry <br />Water Line 26" <br />Yes <br />Not Alarmed <br />Yes <br />No <br />5 Minutes <br />12:17 <br />.001 <br />12:47 <br />.001 <br />30 Minutes <br />0 <br />005/30 Minutes <br />Pass <br />Yes <br />Yes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to m of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />