My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_1994-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 12:01:45 PM
Creation date
6/23/2020 6:46:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2001
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
95_ PIPING INFORMATION <br />PIPING INFORMATION TANK# TANK# TANK# TANK# <br />DISTANCE from <br />DISPENSER to TANK <br />MANUFACTURER <br />SYSTEM TYPE <br />CONSTRUCTION ** <br />MATERIAL *** <br />LEAK DETECTION SYSTEM <br />100% METHANOL COMPATIBILITY with <br />FRP <br />CORROSION PROTECTION <br />* System Type; suction, pressure, and gravity <br />** Construction: single -walled, double -waited, tined -trench, etc. <br />*** Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />26. Piping (cross-sectional diagram, including connections to tank and dispensers). <br />Double watt piping or _ Secondary containment (Trench liner, etc.) <br />(1) Product line (leak detector or automatic shut-off on <br />pressurized piping). <br />(2) Vent and vapor recovery tines if not designed to <br />prevent the entrance of standing fluids. (Ball float valve) <br />(3) Manways and other single walled pipe fittings on a <br />double -walled tank, if not designed to prevent the <br />entrance of standing fluid. <br />27. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forte submitted. <br />28. Plan review and operating permit fees paid. <br />29. Monitoring and Response Plans submitted. <br />30. Proof of financial responsibility on file. <br />31. What is the approximate depth to ground water: <br />(include source of information - borehole togs, monitoring well data, water <br />studies, etc.) <br />32. Total number of tanks an site after installation: <br />33. Any existing tanks to be removed or abandoned? YES [ ) NO [ I if yes, submit State Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34. Responsible party(ies) shall submit a ■Letter of Comaitmentm prior to the <br />installation of new tanks. (Applies to sites with documented soil and/or groundwater contamination) <br />35. County/City Fire District and Building Department notified. <br />36. REMARKS <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.