My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_1994-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 12:01:45 PM
Creation date
6/23/2020 6:46:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2001
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_1994-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 I <br />^au)" SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />11111 oil, Ill• 1810 E WELTON AVE. STOCKTON• CA 95205 <br />4 DEVELOPMENT SERVICES PHONE (209) 468.0 t 20 <br />PUNNING PHONE (209) 468.3120 <br />BUILDING PHONE (2091 468.3123 <br />NEIGHBORHOOD PRESERVATION PHONE (209) 4683021 <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location <br />Owner lgc. Phone No. 2d�-X83.-53" <br />► Contractor I-14 Tot.1 phone No. I�-Iia License No. L�1z <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1• Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />2• Submission of verification, e.g. load ticket, within 30 clays of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />�• Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B• Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a.Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />Name (Print) <br />f��dJ�C:TGx�i . <br />Ti r' <br />Signature <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.