Laserfiche WebLink
( i <br />othef types of tanks. I <br />• e I <br />(1) Chemical composition of materiat Stared is provided. <br />(2) Chemical abstract service rURber (CM) <br />overflow protection systems (detail drawing of spilt catchment bast ns)/piping�sump(s) required, including tank fill and all <br />s). (sectio 263S (b) t8)) <br />1 <br />A. Spitlt catchment basin. <br />Capacity: <br />Type <br />monitoring (motor vehicle fuels only). <br /><5) Written fitting procedure: tsection 2b3S (9 (A) (6) (C)) <br />(a) Tank volume capacity is at 103% or +200 gallons. <br />(b) Metered product entering UST and tan4 capacity <br />1 determined immediately prior to fitting. <br />C. Mechsnicat/Etectronic monitoring (mandatory for non -motor vehicle feet tanks) (Section WS (8) (A) (B) (C)] <br />ve-1111 <br />(1) Levet sensing device and fit or #3 below. j <br />(2) Audibte/visuat storm triggered by a liquid tevet sensor. <br />-�---��--��� (3) Automatic shut-off. <br />>- Double -wetted tank a!ipd system allow for monitoring of the annutor space. <br />tSact" 21535 (8) (A� (g) (C)) 1 <br />i I <br />A. Release from .lo container designed to drain to a specific tocation within the onnutar space to be detected by <br />a monitoring device or method. j <br />B. Continuous dtectronic monitoring connected to audible/visuat storm system. <br />C. Type of Detdctors (Detail of monitoring equipment as instatted). <br />(1) Brand Nam: <br />(2) Model *xiber: 1 <br />Vapor liquid both. <br />6(>3 Sensor Type - <br />4), Sensor Specification. <br />(S) Brochures provided. <br />(u) Manufacturer's written installation instructions. <br />(7) Location of robe for: ufY11® <br />(tank)•• ,F= (piping): <br />r i <br />i•r�irep,:5riT <br />16. e Any special accessories, fittings, Coatings, or linings not inherent wi.thin the initial design of the 10 tank or double- <br />wall UST. [Section 2631 (r)) 1 <br />i <br />A. Approved by a nationally recognized independent testing organization. <br />Demonstration of integrity with the 10 tank or double waited UST. <br />17. Tank's subierit to floatation. CSection 2635 (s)I <br />A. Anchored by deadman or stab. <br />B. Anchors to be irntatted as specified by manufacturer <br />C. Installation details provided on plans. <br />_ D. Calculations provided. <br />Fiber liners between tank(s) and excavation to prevent infiltration df native soil into backfill material" <br />,8. -- (-r/ <br />5 <br />