Laserfiche WebLink
CORROSION PROTECTION <br />® system Type; suction, pressure, and gravity <br />** Construction: singtO-watl,04 doubt*-watted, tined -trench, etc. <br />*� Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />Piping (cross-sectional diagram, inctuding connections to tank and di pensers). <br />Double wait piping or _ Secondary containment (Trench linea, etc.) <br />('1) Product line (leak detector or automatic shut-off on <br />pressurized piping). <br />(2) Vent and vapor recovery tines if not desi.gnod to <br />prevent the entrance of standing fluids. (gall float valve) <br />(3) Manways and other single waited pipe fittings on a <br />doubte-wafted tank, if not designed to prevent the <br />entrance of standing fluid. <br />7. state Water Resources Control Board 10Facility (A)" and "Tank Permit (B)" application forms Submitted. - <br />8. Pian review and operating permit fees paid. <br />9, � Monitoring and Response Plans submitted. <br />0, V Proof of financial responsibility on file. t <br />1. What is the' approximate depth to ground water: <br />(include source of information - borehole togs, monitoring welt date; water <br />studies, etc.) ®f1C(Ilrlw ill <br />s2Total number of tanks on site after installation: <br />�3,, :]L7� Any existitlg tanks to be removed or abandoned? YES NO i ) If yes, submit state Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34. Responsible party(its) shalt submit a -Letter of Commitment' prior to the <br />installation of new tanks. (Appties to sites with documented soil and/or groundwater contamination) <br />35. County/City Fire District and Building Department notified. <br />36. REMARKS <br />7 <br />PING IWFOMTION I <br />•IPING� OORMATION <br />TANK# TANK# �•+' BANK# i TANKS <br />-[STANCE frac <br />.ISPi NSER to TANK <br />*-4-4L P <br />vnns+�s jV <br />A. � W® "r� PSAD <br />;ANUFACTURER <br />-YSTU TYPE • <br />�NgTRUCTION °* <br />i <br />ATERIAL <br />-EAK DETECTION SYSTEM'' <br />100% METHANOL COMPATIBILITY with <br />FRP <br />J► <br />CORROSION PROTECTION <br />® system Type; suction, pressure, and gravity <br />** Construction: singtO-watl,04 doubt*-watted, tined -trench, etc. <br />*� Material Type; steel -iron, stainless-steel, fiberglass, etc. <br />Piping (cross-sectional diagram, inctuding connections to tank and di pensers). <br />Double wait piping or _ Secondary containment (Trench linea, etc.) <br />('1) Product line (leak detector or automatic shut-off on <br />pressurized piping). <br />(2) Vent and vapor recovery tines if not desi.gnod to <br />prevent the entrance of standing fluids. (gall float valve) <br />(3) Manways and other single waited pipe fittings on a <br />doubte-wafted tank, if not designed to prevent the <br />entrance of standing fluid. <br />7. state Water Resources Control Board 10Facility (A)" and "Tank Permit (B)" application forms Submitted. - <br />8. Pian review and operating permit fees paid. <br />9, � Monitoring and Response Plans submitted. <br />0, V Proof of financial responsibility on file. t <br />1. What is the' approximate depth to ground water: <br />(include source of information - borehole togs, monitoring welt date; water <br />studies, etc.) ®f1C(Ilrlw ill <br />s2Total number of tanks on site after installation: <br />�3,, :]L7� Any existitlg tanks to be removed or abandoned? YES NO i ) If yes, submit state Water Resources <br />Control Board "Facility Permit (B)" application form. <br />34. Responsible party(its) shalt submit a -Letter of Commitment' prior to the <br />installation of new tanks. (Appties to sites with documented soil and/or groundwater contamination) <br />35. County/City Fire District and Building Department notified. <br />36. REMARKS <br />7 <br />