Laserfiche WebLink
ONITORING PLAN -(Page 1 0 <br /> TYPE OF ACTION ❑ I.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2. <br /> (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Regular(87) <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as Facility Name or DBA) Tesoro/Shell #68151 3 <br /> BUSINESS SITE ADDRESS 35 N. Cherokee 103. CITY 104. <br /> Lodi <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> bathe equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified Personnel.[23 CCR§2632,2634,2638,26411- <br /> MONITORING EQUIPMENT IS SERVICED 490-3a. <br /> Q ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> III. MONITORING LOCATIONS <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634] 490-4, <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hatak all <br /> I) <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5, <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490-6. <br /> PANEL MANUFACTURER: Gilbarco 490-7. MODEL#: EMC 490-8. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-420 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 490-.ii.. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY490-16. <br /> ❑ c.WEEKLY <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. 490-18. <br /> ____.____.__.._�._�........._......___....__(] c.OTHER(Specify): 490-19. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§2646]] 490-20. <br /> -- ..............-------........ -__...- ----_ __....--...___........................._...................................._.............----......_.........._.._.... ............ ................................. -_.......__........_...._........_.._... <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS x90-21. <br /> _..._..__.....--- ..-..'._._..-_._._...._.......... _.. _.._.......--_... __.........-._.._- ..._.._... _.....__....... -------- ............... -....----..... ........_._._....._......_....-........_._._......._...avo-zz:.......,_... <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci 490-24. <br /> ----- .._ .. ......--__....._-................_._..........__----_......._...._...._.........._......._......_........_........ ---- ------.... (Specify): a90-2s. <br /> ❑ 99.OTHER S(Specify): <br /> _..._......__26...... <br /> ( p fy). 490.26. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Chak <br /> all <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [2"'CR SECONDARY CONTAINMENT IS: ® a.DRY 490-29. <br /> §_636] ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM <br /> PANEL MANUFACTURER:GllbarCo 490.30. MODEL#: EMC 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑ a.YES El b.NO 490.34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-35. <br /> --- --...._..._.....-._....-_._...._...._-_..__._..... _........__ .__..........._.._..._._...._......-............-.-------- -...............................-._._......................._._........_......................­­­.- <br /> LLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 CCR126361 <br /> . t. - MA..... URER(S): ed Jacket 490-37. MODEL#(S): FX1 V 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 49040 MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.l&p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-43, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> ._ <br /> _......- -.... <br /> -- .. .................._........_......-._-.._.__ _ .--- _.......... __....... ---... - -.......... - .......... <br /> 4.PIPE INTEGRITY TESTING. 490-45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4 490-46. <br /> _...........---- ..__..-_ __.._._..--- --------..._. ---...._..._......_ <br /> ❑ 5. VISUAL PIPE MONITORING. c 490-48 <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM tD• 490-49. <br /> 'Allowed for monitoring of unburied emergency generator feel piping only per HS Ny)(3)-- <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(x)(3)] Rar 490-50, <br /> _..............---._..............._..................................... ................. -- <br /> ❑ 7 NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20 CHAPTER 6.7 IS CONNECTED TO THE TANK SYS IE <br /> .. ........ __.. ......... _ ........ .. ....---_....................... .... 490 <br /> � 51 <br /> ❑ 99.OTHER(Specify) t ;;_s 490503 52 <br /> UPCF UST-D(12/2007)-1/7 www.unidocs.org <br />