Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SONITORING PLAN --(Page 2 0o <br /> VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Checkall <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that apply) <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING ® 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b- <br /> LEAK MONITOR MANUFACTURER: A90-55. MODEL#: 0-90-56. <br /> LEAK SENSOR MANUFACTURER:Bravo 490-57, MODEL#(S):B-2000 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 490-60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 490-61, <br /> UD(,MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES [I b.NO 490-61. <br /> UDC CONSTRUCTION IS: ® I.SINGLE WALL ❑ 2.DOUBLE WALL 490-63, <br /> IF DOUBLE WALL: 490-64a <br /> IJDC INTERSTITIAL SPACE48 MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION LELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR§2644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. -090.66 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67, <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ® a.ALARM LOGS F-1 b.VISUAL INSPECTION RECORDS E] c.TANK INTEGRITY TESTING RESULTS <br /> Oil.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> [j f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® It.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY-] (Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-690-. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69s. <br /> ❑ OTHER(Specify): 490-69h_ <br /> 490-69i. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> > The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> > Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71. <br /> Drop tube with mechanical flapper set at 95%. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate_a possiblerelease are investigated;and 3.)all monitoring are maintained properly.. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Yesenia Penaflor 490-72 TITLE:Manager 490-73. <br /> NAME: Steve Coulter 490-74. TITLE:Environmental Compliance Administrator 490-75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and infom3 the owner/operator of any <br /> conditions that need follow-up action. x;71--_-_ <br /> XII. OWNER/OPERATOR SIGNATURE ' <br /> CERTIFICATION: I certify that the inform true and accurate to the best of my knowledge. ]_" <br /> APPLICANT SIGNATURE DATE: � T <br /> 490-77. <br /> ❑3Autriz a resentative o 4 2/26/2013 <br /> 906REPRESENTING:0 I.Tank Owr/0 rator❑ nenor <br /> UPCF UST-D(12/2007)-3/5 www.unidoes.org '.4r <br />