Laserfiche WebLink
i <br />Monitoring System Certification -Page 3 of 3 <br />Site Address:— 35 N. Cherokee Ln. Date of Testing/Servicing: 1128/13 <br />F. In - Tank Gauging / SIR Equipment: N Check this box if tank gauging is used only for inventory control. <br />0 Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />11 Yes <br />11 No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />0 Yes <br />0 No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />0 Yes <br />0 No* <br />Was accuracy of system product level readings tested? <br />Cl Yes <br />0 No* <br />Was accuracy of system water level readings tested? <br />0 Yes <br />ci No* <br />I Were all probes reinstalled properly? <br />0 Yes <br />I <br />e all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section R below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLD's are not installed. <br />Complete the following checklist: <br />10 Yes <br />0 No* <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br />D N/A <br />(Check all that apply) Simulated leak rate: IN 3 g.p.h. (L); 0 0.1 g.p.h. (2); 0 0.2 g.p.h. (2.). <br />Notes: 1. Required for equipment start-up certification and annual certification. <br />2. Unless mandated by local agency, certification required only for electronic LLD start±a.,_ <br />0 Yes <br />0 No* <br />Were all LLD's confirmed operational and accurate within regulatory requirements? <br />0 Yes <br />0 No* <br />Was the testing apparatus properly calibrated? <br />19 Yes <br />0 No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak? <br />0 N/A <br />0 Yes <br />a No* <br />For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak? <br />2 N/A <br />0 Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N N/A <br />or disconnected? <br />[I Yes <br />0 No* <br />For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system <br />0 N/A <br />malfunctions or fails a test? <br />0 Yes <br />0 No* <br />For electronic LLD's, have all accessible wiring connections been visually inspected? <br />Iffi N/A <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: Replaced 87 Product Relay - Re -tested & Passed. <br />