Laserfiche WebLink
11 <br />E <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EMD) <br />1. Site map enclosed? YES= N0 <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title B. <br />Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this Will be done. (if <br />ad&a piping, UDC's, or other LIST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />replace annular space sensor in regular and diesel tanks <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />VR - 420 <br />