Laserfiche WebLink
ONITORING PLAN - Pae 1 <br /> 20 <br /> TYPE OF ACTION ❑ L NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item on/v) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): Diesel <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Same as Facility Name or DBA) 3 <br /> Tesoro/Shell #68151 <br /> BUSINESS SITE ADDRESS 103. <br /> 35 N. Cherokee Lodi 104. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be performed by qualified personnel.[23 CC_R_§2632,26.34,2638,2.6411 <br /> --.... _ <br /> MONITORING EQUIPMENT IS SERVICED - _ <br /> Q ® 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3a. <br /> 490-36 <br /> III. MONITORING LOCATIONS <br /> ❑ I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ® 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§2632,2634] 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (h yak I, <br /> ® 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,20341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 190-6 <br /> PANEL MANUFACTURER: GilbarCo 490-7, MODEL#: EMC 490-8 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL#(S): 794390-420 490-10. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 190-13. <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 c.OTHER S ecifp� 490-18 <br /> ...............__..-.__....,._..._..__......__.._........._..__._. g.p.h. g.p.h.h ( P V) 490-19. <br /> _._._....__...__...._.__.... .............................-__..---._..._._..._......_____...-_._... <br /> _....._....490.20... <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 CCR§26-46.11 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS Elb.60 HOURS 0-21 490-21. <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-24. <br /> -_.._.._._._._.. ---1-- '' ---._..... ---'-- ._....._..._........_._._-..------''-'-- ------------'--._�...p.._.... y�_ a90-zs.. -. <br /> ❑ 99.OTHER(Specify): 490-26. <br /> 490-27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thatack <br /> all <br /> ® I.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490'28. <br /> [t-63161 R SECONDARY CONTAINMENT IS: ® a.DRY Elb.LIQUID FILLED Elc.PRESSURIZED Eld.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:GilbarCo 490-30. MODEL#: EMC 490-31 <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(S): 794380-208 490-33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES Elb.NO 490-35. <br /> --......... __._.....----...--------._.._.__..._.�-.__........._.._...._....._ ----._._...._... ---._...__......_.._._.........._..._...._._...............-- .. . ...- <br /> --.._........_............_..._._.... __---._......_._.................. <br /> ® 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR§26361 <br /> MLLD MANUFACTURER(S):VaporleSS 490-37 MODEL#(S): LD-2000 490-38. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 490-40. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 190-41 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.43, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-44. <br /> _...._...... ...._........_.__................_._.._._..-...---.._........_.............._'------._...... --- <br /> ❑ 4.PIPE INTEGRITY TESTING. ` 45. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS 490-46. <br /> Q ❑ e.OTHER(Specify) 490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> 440-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49. <br /> ................. formonitoringofunburied.emer.&rncy__generator.fuel,pinlS.only„ser HSC„§2528,Llu O).,_._.....__........_. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(a)(3)1 490-50. <br /> _..._.........._._._.........__-_.....-- .._...^_.__..._....----.._.._....__... -_._._........._._.._......_......._...._......_-...-..............__.........-------............................._.........._._.........._..._............._ ._._.._.. .........._-....__.._-._...................... <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. -49051. <br /> ............-.._. .__--_._ ._-_.___..__................................_-_.___...__....---.....................__._._._.__._.___.___.__ ._ .. <br /> El99.OTHER(Specify) 490-sz. <br /> 490-53 <br /> UPCF UST-D(12/2007)-1/7 www.unidocs.org <br />