My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Be sure to always READ THE DRAWINGS or plans to make <br />sure that your mounting points are the same. Call Bravo <br />Systems if any problem occurs. <br />A2 - Position and bolt down conversion frame to the dispenser pan using the anchor plates of the <br />conversion frame with minimum 1/2" Diameter bolts. Use plastic caps to cover the bolts/nuts. <br />For Non -Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br />A3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br />A4 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />if necessary. <br />IT DEPENDING ON NEW DISPENSER USED AND/OR <br />wk [01141A OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br />NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br />TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br />A5 - Position and bolt down the dispenser to the conversion frame with the anchor bolts provided. <br />Dispenser <br />Base oft. - <br />Anchor Bolt <br />Anchor <br />Plate — <br />dap <br />�: �. <br />2fZ. Bolts <br />.-0 <br />r <br />9. <br />Equipment shown is for <br />'° illustration purposes only <br />and is not a reference <br />for your layout within <br />the hydraulic cabinet <br />ii -Conversion Frame 3-25-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.