My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />RESPONSE PLAN - PAGE I (One to <br />TYPE OFACTION I. NI. -..W PLAN 2. CHANCE OF INFORMATION R01 <br />1. FACILITY INFORMATION <br />FACILITY ID 4 (Agency Use Only) <br />BUSINESS NAME (Same as FACILITY NAME) <br />USA[Tesoro 68151 <br />BUSINESS SITE ADDRESS ")3 1 BASENESS SITE crry <br />35 N. Cherokee Lane Lodi <br />It. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />If safe to do so, facility personnel will take immediate measures to control or stop any release (e g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />> Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />Absorbent material will be used to contain and clean tip manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no Ion-er intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous, Used absorbent material, reusable or waste, will be stored in a properly labeled and scaled contaImer. Waste material shall be disposed of <br />appropriately. <br />Facility personnel will determine whether any water removed from secondary containment systems, or from clean -tip activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br />§6626111 finds that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum laver may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not he disposed to storm water <br />We will review secondary containment systems for possible deterioration if any oftlic following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment <br />2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment. <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment io treat orneutralize <br />released producVwastc, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />111. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly. and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary, <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED:"lele rily ifapplicable) <br />EQUIPMENT <br />LOCA TION <br />AVAILABILF I'V <br />Waste Hauler RIO <br />Belshire Environmental R20 <br />2417 RY) <br />RIJ <br />(949) 460-5200 R21 <br />R31 <br />R12 <br />R2_1 <br />Rai <br />all <br />R23 <br />R, <br />R14 <br />R21 <br />MS <br />R25 <br />R35 <br />IV. RESPONSIBLE PERSONS <br />THE FOLLONVING PERSON(S) IS/ARE RESPONSIBLE FOR AuTtjORIZING ANY WORK NECESSARY UNDER TEAS RESPONSE PLAN: <br />R40 <br />TITLE R's 0 <br />Sandy Edwards <br />Environmental Compliance Admin. <br />NAME R41 <br />TITLE R51 <br />Grace Keller <br />Manager <br />NAME R42 <br />TITLE R52 <br />NAME R43 I <br />TITLE M3 <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BENI 'LDE AS FOLLOWS� <br />0 t. ADDrriONAL SYSTEM TESTING OR DATA COLLECTION 0 2. INSPECTION BY QUALIFIED PERSONS 1713 RECALIBRATION OF FOUIPMENr R60 <br />099 OJHER(Specify): R6I <br />UN -0226 - 113 www.unidoes.org Rev. 94/92/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.