Laserfiche WebLink
E <br />Monitoringft <br />System Certification <br />Site Address; 35 N. Cherokee Ln., Lodi <br />v <br />N. Cherokee - Ln. <br />Date map was drawn: 01/24/18 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br />System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared. Page 1 of 1 05100 <br />TLS . . .... <br />. . . .. . . . . <br />CAS , . . . . <br />Piping Runs are estimated: <br />. . . . . . . <br />ESO . <br />. . . . . . <br />. , <br />. . . . , <br />s7 Some . . . . <br />. . ios . <br />. �>v. QTG • <br />. . .�� . <br />(. V t j F .J <br />420. <br />. . . . . . . . . , <br />. . . . . . . <br />....... <br />. <br />..... ............... <br />. . <br />. <br />.............. <br />5.......4. <br />. <br />...... <br />... ................ <br />. <br />Bloat & . <br />. <br />. . . <br />=Fl.& <br />. . <br />9I.sump <br />. . 205.Chains <br />LD 2000.. <br />e <br />. <br />. <br />v <br />3. .. <br />6. <br />.......... <br />. . . <br />........2...,. <br />Float & . <br />.Float & <br />.. <br />.... <br />S2osp• <br />CD <br />g . <br />0• <br />420 <br />............. <br />Chains . <br />Chains <br />t n a000 <br />. <br />. . . 5. . . . . . <br />...... <br />. . . I . . . . . . <br />...... <br />. . . . <br />. . . . <br />. . . . . <br />N. Cherokee - Ln. <br />Date map was drawn: 01/24/18 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring <br />System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following <br />equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br />containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level probes (if used <br />for leak detection). In the space provided, note the date this Site Plan was prepared. Page 1 of 1 05100 <br />