Laserfiche WebLink
SAN JIMUIN COUNTY ENVIRONMENTAL HEALTH DTMENT <br />UNDERGRO D STORAGE TANK PROGRAM F WORKSHEET <br />+r I!II <br />APPLICANT BILL G NAME APPLICANT CONTACT NAME <br />ELITE IV CONTRACTORS, INC. CARRIE MILLER <br />APPLICANT MAILING ADDRESS APPLICANT PHONE # WITH AREA CODE <br />2535 WIGWAM DRIVE <br />(209) 461-6337 <br />CITY STATE ZIP CODE CIRCLE WORK TO BE DONE: <br />STOCKTON CA 952 0 5 Closure Installation Repair Retrofit <br />ACTIVE FACILITY <br />1998 1999 2000 2001 2002 2003 <br />$500 FEE INCLUDES FACILITY FEE + -1 TANK- ($»o) x (hanks) ($170) X (ftnks) <br />I $125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED $ <br />TANK SURCHARGE = $10 / TANK $ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$17.50/ FACILITY $ <br />PERMANENT CLOSURE <br />IRemoval or Pemlitted Closure in PlaceANK ID # (s) : CLOSURE FEE = $279 / TANK # TANKS X $279 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : TEMPORARY CLOSURE FEE = $279 / FACILITY <br />IN5IALLATION PLAN CHECK <br />Plan Check and Construction Ins <br />TANK ID # (s) : <br />actions) <br />PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 /FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) $ <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect) <br />ALL FEF ARE BASED <br />APPLICANT BILL G NAME APPLICANT CONTACT NAME <br />ELITE IV CONTRACTORS, INC. CARRIE MILLER <br />APPLICANT MAILING ADDRESS APPLICANT PHONE # WITH AREA CODE <br />2535 WIGWAM DRIVE <br />(209) 461-6337 <br />CITY STATE ZIP CODE CIRCLE WORK TO BE DONE: <br />STOCKTON CA 952 0 5 Closure Installation Repair Retrofit <br />ACTIVE FACILITY <br />1998 1999 2000 2001 2002 2003 <br />$500 FEE INCLUDES FACILITY FEE + -1 TANK- ($»o) x (hanks) ($170) X (ftnks) <br />I $125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED $ <br />TANK SURCHARGE = $10 / TANK $ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$17.50/ FACILITY $ <br />PERMANENT CLOSURE <br />IRemoval or Pemlitted Closure in PlaceANK ID # (s) : CLOSURE FEE = $279 / TANK # TANKS X $279 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : TEMPORARY CLOSURE FEE = $279 / FACILITY <br />IN5IALLATION PLAN CHECK <br />Plan Check and Construction Ins <br />TANK ID # (s) : <br />actions) <br />PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 /FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) $ <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect) <br />ALL FEF ARE BASED <br />ACTIVE FACILITY <br />1998 1999 2000 2001 2002 2003 <br />$500 FEE INCLUDES FACILITY FEE + -1 TANK- ($»o) x (hanks) ($170) X (ftnks) <br />I $125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED $ <br />TANK SURCHARGE = $10 / TANK $ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$17.50/ FACILITY $ <br />PERMANENT CLOSURE <br />IRemoval or Pemlitted Closure in PlaceANK ID # (s) : CLOSURE FEE = $279 / TANK # TANKS X $279 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : TEMPORARY CLOSURE FEE = $279 / FACILITY <br />IN5IALLATION PLAN CHECK <br />Plan Check and Construction Ins <br />TANK ID # (s) : <br />actions) <br />PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 /FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) $ <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect) <br />ALL FEF ARE BASED <br />PERMANENT CLOSURE <br />IRemoval or Pemlitted Closure in PlaceANK ID # (s) : CLOSURE FEE = $279 / TANK # TANKS X $279 = <br />TEMPORARY CLOSURE <br />(Plan Review and Inspections) <br />TANK ID # (s) : TEMPORARY CLOSURE FEE = $279 / FACILITY <br />IN5IALLATION PLAN CHECK <br />Plan Check and Construction Ins <br />TANK ID # (s) : <br />actions) <br />PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 /FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) $ <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect) <br />IN5IALLATION PLAN CHECK <br />Plan Check and Construction Ins <br />TANK ID # (s) : <br />actions) <br />PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 /FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) $ <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect) <br />MISCELLANEOUS <br />TRANSFER FEE _ $ 20 $ <br />CONSULTATION FEE _ $ 93/ HOUR $ <br />UNAUTHORIZED RELEASE EVALUATION FEE _ $ 93 / HOUR $ <br />SAMPLING INSPECTION FEE _ $ 93/ HOUR $ <br />OFFICE USE ONLY <br />ALL FEF ARE BASED <br />OFFICE USE ONLY <br />