My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:47:58 PM
Creation date
6/23/2020 6:47:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• t <br />Monitoring System Certification <br />Site Address: <br />UST Monitoring Site Plan <br />/15 1� L_, <br />Date map was drawn: 6 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />CALNI-0Z <br />Page of <br />11/15/99 <br />! lt!'4.'�. 1c .1 <br />. . . . <br />. . . . . . . . . . . . . . . . . . . . . . . <br />e.......... <br />.......... <br />.... ... . . . . . . . . . . . . . . . <br />..................... <br />. "' <br />� - <br />� <br />. . . . . . . . . . . . . <br />f <br />. . . . . . . . . . . . . . <br />............... d <br />_,. <br />a?d <br />r :: <br />I <br />: .:�:. <br />:................. . <br />................ . <br />:cs. ✓� i .. <br />© -vr <br />................... <br />. . . . . . ... . <br />. . . . . . . . . . . . . . <br />. <br />. . . . . . . . . . . . . �� <br />SJ <br />s� <br />. . ..i <br />. . . . . . . . . . . . . . . . . <br />............ <br />............ '. <br />..... ..... <br />................... <br />................... <br />Date map was drawn: 6 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this Site Plan was prepared. <br />CALNI-0Z <br />Page of <br />11/15/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.