My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:47:58 PM
Creation date
6/23/2020 6:47:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. • Piping (cross-sectional diagram, including connections to tank and dis ers). <br />` (A) Vent and tank riser priacontairment system equipped with overfillilvention system that: <br />Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)], or <br />Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(C)l, or <br />(B) Vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is <br />released. <br />No valves or pumps installed below grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following r uirements <br />Primary piping in contact with hazardous s aner normal operation conditions shall be: <br />installed inside a seconda y contain gn� �,I#the form of: secondary pipe_Vault or <br />lined trench to be sl c ection at the low point of the piping. <br />Primary piping a seco containment sys will be installed in accordance with industry <br />code of practice nd o + ry consensus standar .. <br />�1 Lined trench used s secondary containment <br />t / Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(F) nderground piping with secondary contairment will be equipped and monitored as follows: <br />Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: Model: <br />Annual monitoring will be conducted on the pressurized piping with secondary contairment. <br />Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20.� State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22. X What is the approximate depth to ground water: <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) <br />23. Total number of tanks an site after installation: <br />24. County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owne01 <br />r or ator must acknowledge this res ibil'ty for rkpla submittal by signature and date below. <br />Name Title Data <br />CONDITIONS OF APPROVAL: <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.