My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_1986-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:47:58 PM
Creation date
6/23/2020 6:47:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2005
RECORD_ID
PR0231413
PE
2361
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #3138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
231-190-12
CURRENT_STATUS
01
SITE_LOCATION
1153 LINCOLN BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231413_1153 LINCOLN_1986-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� WRITTEN ROUTINE MONITORING PROCEDURE <br />As required by California UST Regulations, Section 2632 (d)(1) <br />Quik Stop Market #138 <br />1153 Lincoln Blvd. <br />Tracy, California <br />The secondary containment of each underground storage tank is continuously monitored by a <br />Ronan X76AM-1001 electronic monitor using liquid sensing probes set to immediate response <br />time. The product delivery lines are monitored by Ronan X76PM-1000 electronic line pressure - <br />loss -sensing leak detectors. The line leak detectors automatically shut off power to the turbines <br />if there is power loss to the monitoring panel or if a leak is detected. This eliminates the <br />requirement to annually test lines. The monitoring panel is located in the market office. <br />The Ronan monitor is placed in test mode daily to check audible and visual alarm function by Jai <br />or Sheela Balram, Franchisees, or their designated duty clerk, and the results recorded on the <br />"Daily Monitoring System Inspection Log". The monitoring panel, tank interstitial sensors, and <br />line pressure loss sensors are checked and recertified annually. The results are forwarded to San <br />Joaquin Public Health Services. <br />In the event that the system goes into alarm, the Franchisee will immediately contact the Quik <br />Stop Gasoline Department, which will in turn dispatch a qualified service company to the site. <br />The service company will determine the cause of alarm and notify Quik Stop of site conditions. <br />If an unauthorized release to secondary containment has occurred, action will be immediately <br />taken to implement the Written Response Plan. <br />Preventive maintenance on the monitoring system is scheduled annually in conjunction with <br />recertification and testing. <br />A description of the gasoline system operation and operator's responsibilities are included in the <br />Franchise Agreement. Initial training in operation of the tank system and monitoring equipment <br />is conducted "on the job" under the supervision of Quik Stop personnel. The training period <br />depends upon the complexity of the system and Franchisee proficiency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.